Monday, April 22, 2019
Carriage of goods by sea under Charter Party Case Study
Carriage of goods by sea under Charter Party - Case Study typefaceThe air owner is also liable for the ships under capacity and lower-speed than declared to TD. On the other pass the conducter TD is liable to the shippers for the damage caused by fire to the cargo of Smart Clothing which he can phone call from the Ship Owner. This could be possibly circumvented by having the shippers insurance claim settled and ultimately transfer the obligation to the Ship owner. The sub-charterer BV similarly can have the insurance claim of V for damage to cargo season loading and ultimately have the liability transferred to ship owner through TD the main charterer. And the parties who want to bulge claim against the owner, may do so by invoking arbitration as envisaged by the Charter ships company agreement in clause 21.This case relates to rights and liabilities of parties under the contract of charter party for carriage of goods by sea. The six parties involved are 1)Charterer (Timely D elivery hereafter TD, 2)Owner of ship The Bulky Whirlwind (Owners Co) hereafter O, 3)Cargo Co, hereafter C, 4) trip SARL, hereafter BV 5)Vignoble SARl, hereafter V, and 6) Smart Clothing Co, hereafter SC.As against the ships declared carrying capacity of 12,000 TEU and speed capacitance of 23 knots, 2000 TEU are occupied by articles of ships own essential use and speed is short of 3-7 knots. Ships chieftain refuses to take the shorter and direct itinerary and also to pick up cargo located in the shorter route ordered by TD.for safety reasons. The crew members careless smoking damages a cargo precious $ 300 000 by fire for which there was no safety trained staff for fire fighting. callable to arrest of the ship, 10 days are lost by stay at the port of Southampton. It is noted Box No 35 in form of Charter party is left blank. The relevant thump relates to applicable Law and Arbitration. The form provides that if the box is not filled in, sub clause (a) of condition no 21 of Char ter parry form shall apply. The relevant condition is reproduced below.1 Charter party is contract amongst the owner of a ship and a hirer of the ship for using it to transport usually cargo. level off though the hirer is using the ship, the ship-owner exercises control over it for the navigation and management while the carrying capacity is in the discretion of the hirer known as charterer. Four types of chartering in vogue are voyage charter, epoch charter, bareboat charter and lump-sum contract. 2A time charter is another common form of agreement, with the owner of the ship operating his ship as instructed by the charterer between certain agreed dates for an agreed daily or monthly rate. During this period, it will be the charterer who will pay for the running costs of the ship such as the fuel and insurance. An analogy would be a contract to hire a car.3A cursory glance at the conditions set out in the Charter party form reveals Master failure to carry out Chatterers instru ction to take Suez route amounts to violation of condition no 7 ( c )4 of the Charter Party. And damage due to Owners servants smoking inside attracts condition no 18(iii) (3)5 The Charterer is also entitled to 10 days off-hire for the arrest of the vessel due to Cs claim for Os default in a previous charter attracting Hague-Visby rules and far having lost time (to be estimated) due to longer route as per condition
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.